Warning: mkdir(): No space left on device in /www/wwwroot/NEW17.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/sh-yikai.com/cache/9d/e89f5/d235c.html): failed to open stream: No such file or directory in /www/wwwroot/NEW17.COM/func.php on line 115
HENGTONG GROUP CO.,LTD.
  • 丝瓜成人APP视频,丝瓜视频成人,丝瓜视频成年人,丝瓜视频污片下载

    News

    News

    Home| News| News

    Hengtong has delivered to the 900MW Dubai PV project phase B

    2022-10-27 8405 Font size:

    Hengtong has delivered to the 900MW Dubai PV project phase B. The project is a largest PV Power Plant Project under construction in Dubai, using advanced solar power generation technology. Located in Dubai Maktoum Solar Park and divided into phase A, B and C, the project officially started in July 2020 with a targeted installed capacity of 1,050 MW in total. Once completed, it will become the most advanced demonstration of solar power generation in the UAE, supplying 2.268 billion kWh electricity to 270,000 buildings annually, reducing carbon emissions by 1.1 million tons per year.

    网站地图